Lynch Hill Enterprise Academy External Tarmac MUGA Installation
Client: Sebmat
Sector: Education
Project Manager: Ryan Sharp
Timescale: 2 weeks
Installation of a 1500m2 Tarmac Muga Pitch laid with highly porous material, this is also lined with 3 different sport pitches. This was built with 250mm type 3 stone as a foundation which is necessary for this type of porous tarmac. These works have given this area a new life, used everyday for PE classes and for lunch / break time periods.